Questions
2 waiting for an answer. Anyone on the project can answer.
Does anyone know when DEWA are energising the substation? The temporary supply is fine for now but the lift commissioning needs permanent power.
Contractor · asked 18 days ago · Anyone can answer
I chased them on Tuesday. They said within two weeks, no firm date. I will push again.
Owner
- About drawing: SD-610 — Sprinkler Coverage, Basement Rev B
Before we close the basement ceiling — is the sprinkler layout on SD-610 Rev B final, or is the civil defence comment still outstanding?
Contractor · asked 18 days ago · Asked of Consultant
Answered (4)
- About snag: #3 Grout colour inconsistent across the threshold (Majlis / entrance threshold)Answered
Is the grout on the majlis threshold going to be redone in one go, or patched? I would rather it was all lifted than see a join.
Owner · asked 18 days ago · Anyone can answer
All of it, in one pour. Patching a threshold never matches — it will be lifted back to the door line.
Contractorthe answer
- About snag: #2 Extract fan noisy and undersized (Guest WC, ground floor)Answered
Which extract fan was actually installed in the guest WC? The snag says undersized and I want to check it against the schedule before you order a replacement.
Consultant · asked 18 days ago · Anyone can answer
It is a 100mm inline, 85 m³/h. The schedule calls for 150 m³/h so it is genuinely undersized — replacement is on order, arriving Sunday.
Contractorthe answer
- About drawing: EL-201 — North & East Elevations Rev AAnswered
The elevations show the majlis window in dark bronze. Is that the same finish as the entrance screen, or a shade lighter?
Owner · asked 18 days ago · Anyone can answer
Same finish — both are RAL 8019 fine texture. The supplier quoted them as one batch so they will match.
Contractorthe answer
Confirmed. It is the same system throughout the front elevation.
Consultant
- Answered
Rev B moved the kitchen island 300mm north. Does the floor waste move with it, or stay where SD-310 shows it?
Contractor · asked 18 days ago · Anyone can answer
The waste stays. The island overhangs it by design — see the note on SD-310 Rev B, bottom right.
Consultantthe answer