You are looking at a demonstration project.

Everything here is real inside Plars — the approvals, the money, the programme — but the people and the files are invented. You can read everything and change nothing. Start your own project.

← Back to Plars

Villa — Nad Al Sheba

Guest (view only)

Plot 214, Nad Al Sheba 3, Dubai

This project is completed. It stays fully readable; an admin can reopen it from Handover.

Snags

What is still wrong, who fixed it, and who checked.

2 still to close · 6 of 8 verified

75% done

  • #1Master bedroomVerified

    Skirting lifting at the wardrobe return

    Skirting has lifted from the wall over about 400mm where it returns into the wardrobe recess. Adhesive failure.

    raised by Consultant · Aug 6, 2026 · fixed by Contractor Aug 8, 2026 · verified by Consultant Aug 10, 2026

    Removed, substrate cleaned and refixed mechanically. Repainted to match.

  • #2Guest WC, ground floorVerified1 question

    Extract fan noisy and undersized

    Extract runs loud and does not clear the mirror. Suspect the flexible duct is kinked above the ceiling.

    raised by Consultant · Aug 6, 2026 · fixed by Contractor Aug 9, 2026 · verified by Consultant Aug 10, 2026

    Flexible replaced with rigid duct and the run shortened. Retested at 30 l/s.

  • #3Majlis / entrance thresholdVerified1 question

    Grout colour inconsistent across the threshold

    Grout on the entrance side is visibly greyer than the majlis side. Two batches.

    raised by Consultant · Aug 6, 2026 · fixed by Contractor Aug 9, 2026 · verified by Consultant Aug 10, 2026

    Raked out and regrouted the entrance side from a single batch.

  • #4First floor, bedroom 3Verified

    Door binding on the frame

    Door catches on the frame at the top hinge side and will not close without force.

    raised by Consultant · Aug 6, 2026 · fixed by Contractor Aug 8, 2026 · verified by Consultant Aug 10, 2026

    Hinges packed and the leaf eased. Closes freely.

  • #5Stair core, half landingVerified

    Paint runs on the stair bulkhead

    Two runs in the final coat on the bulkhead face, visible from the landing.

    raised by Consultant · Aug 6, 2026 · fixed by Contractor Aug 9, 2026 · verified by Consultant Aug 10, 2026

    Rubbed down and recoated the full face rather than patching.

  • #6Majlis, north wallVerified

    Socket plate not square

    Socket plate sits about 4mm off level against the marble skirting.

    raised by Consultant · Aug 6, 2026 · fixed by Contractor Aug 8, 2026 · verified by Consultant Aug 10, 2026

    Back box reset and the plate levelled.